Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 29, 2021, 06:05 AM
  • D 0098_D 0097_12282021_221709.mp4

Date
12/28/2021
W/O
926598
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00156
PipeID
P10004
Time
10:05 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9574
Sewer Name
D JOINT OUTFALL D - UNIT 6
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_926598_TV05172_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
57 in.
Upstream MH
D 0098
Downstream MH
D 0097
Dir. of Survey
Downstream
Length Surveyed
344 ft.
Total Length
344 ft.
Structural Index
3
Structural Quick
5L3M
Structural Rating
665
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
665
Pipe schematic from manhole D 0098 to D 0097
MH: D 0098MH: D 0097downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 00980 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start112.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"343.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish343.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish343.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish344 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK344 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK CAPPED344 ft. AMH - Downstream Manhole, Survey Ends - D 0097

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    18.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWM
343.3SRV
112.4TF
0AMHD 0098
2.3SSS
2.3SAP
343.3SSS
0MWL
198.4TF
344MGOCONNECTION AT THE MH 9 OC'LOCK
18.2SRV
0MGOCONNECTION AT THE MH 9 OC'LOCK
343.3SAP
344MGOCONNECTION AT THE MH 3 OC'LOCK CAPPED
344AMHD 0097

Properties (7)

additional_info
630074122821201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2021-12-28T22:05:17-08:00
documentation
PROPIPE
is_lateral_inspection
false