Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 17, 2022, 11:07 AM
  • 02 1887_02 1886_01172022_032206.mp4

Date
01/17/2022
W/O
926762
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01172
PipeID
P04251
Time
3:07 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9832
Sewer Name
02 DOUGLAS AVENUE RELOCATION TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_926762_TV02250_DEC2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1887
Downstream MH
02 1886
Dir. of Survey
Downstream
Length Surveyed
297.8 ft.
Total Length
297.8 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 02 1887 to 02 1886
MH: 02 1887MH: 02 1886downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 18870 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start13.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"28.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"68 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.2 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES160 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"162.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"175.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"209.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"225.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start293.3 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"295.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish297.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK297.8 ft. AMH - Downstream Manhole, Survey Ends - 02 1886

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    128.2 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    225.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
2SAP
28.5TF
297.8MGOCONNECTION AT MH 3 O'CLOCK
293.3TBA
83.6TFA
295.5FM
160TF
0MGOCONNECTION AT MH 9 O'CLOCK
209.1TFA
68TFA
128.2FL
13.4TFA
0AMH02 1887
0MWL
225.7FM
2DAGS
0MWM
295.5SAP
175.2TFA
117.2TFA
297.8AMH02 1886
295.5DAGS
162.9TFA

Properties (6)

custom_field_three
PROJECTING AGGREGATE/FRACTURES
custom_field_two
2
customer
1
datetime
2022-01-17T03:07:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false