Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2022, 08:15 AM
  • A 0714_A 0713_01282022_003919.mp4

Date
01/28/2022
W/O
937203
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00316
PipeID
P07923
Time
12:15 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9718
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
POMONA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
14
Purpose
Routine Assessment
Project
CA_WO_937203
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
75 in.
Upstream MH
A 0714
Downstream MH
A 0713
Dir. of Survey
Downstream
Length Surveyed
205.2 ft.
Total Length
205.2 ft.
Structural Index
3
Structural Quick
5G3G
Structural Rating
410
O&M Index
3
O&M Quick
413G
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
534
Pipe schematic from manhole A 0714 to A 0713
MH: A 0714MH: A 0713downstream0 ft. MWM - Water Mark, 70 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 07142 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.1 ft. OBZ - Obstacles Other, 15 %of cross sectional area, at 06 o'clock, Start - UNDER FLOW12.6 ft. MGO - General Observation - MAG COATING THROUGHOUT205.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish205.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish205.2 ft. OBZ - Obstacles Other, 15 %of cross sectional area, at 06 o'clock, Finish - UNDER FLOW205.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish205.2 ft. AMH - Downstream Manhole, Survey Ends - A 0713

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Other, 15 %of cross sectional area, at 06 o'clock, Start - UNDER FLOW

    5.1 ft. - Obstacles Other, 15 %of cross sectional area, at 06 o'clock, Start - UNDER FLOW

  • General Observation - MAG COATING THROUGHOUT

    12.6 ft. - General Observation - MAG COATING THROUGHOUT

Observations (13)

DistanceCodeObservation
2SAP
205.2SSS
2SRV
0MWM
205.2SAP
0MWL
5.1OBZUNDER FLOW
12.6MGOMAG COATING THROUGHOUT
205.2OBZUNDER FLOW
205.2SRV
2SSS
0AMHA 0714
205.2AMHA 0713

Properties (8)

additional_info
630074012722062
custom_field_three
REINFORCEMENT VISIBLE, SPALLING
custom_field_two
1
customer
1
datetime
2022-01-28T00:15:03-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26232