Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 3, 2021, 08:28 AM
  • 14 0247A_14 0838_12032021_003954.mp4

Date
12/03/2021
W/O
922057
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P20828
Time
12:28 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9612
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_922057_TV14037_NOV2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0247A
Downstream MH
14 0838
Dir. of Survey
Downstream
Length Surveyed
280.2 ft.
Total Length
280.2 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 14 0247A to 14 0838
MH: 14 0247AMH: 14 0838downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 14 0247A0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.4 ft. MGO - General Observation - MAG COAT71.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start277.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish277.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish277.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish277.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish280.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK280.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0838, RUNLIST STATES MH AT 185'

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    15.4 ft. - General Observation - MAG COAT

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    71.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2SAP
0MGOCONNECTION AT MH 9 O'CLOCK
71.8SRV
277.4DAGS
277.4SAP
0AMH14 0247A
277.5SRV
2SSS
0MWL
280.1MGOCONNECTION AT MH 9 O'CLOCK
15.4MGOMAG COAT
280.2AMH14 0838, RUNLIST STATES MH AT 185'
277.4SSS
2DAGS
0MWM

Properties (7)

additional_info
630069120221201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-12-03T00:28:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false