Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2021, 09:35 AM
  • 14 0249_14 0248_12022021_015249.mp4

Date
12/02/2021
W/O
922057
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18304
Time
1:35 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9610
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_922057_TV14037_NOV2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0249
Downstream MH
14 0248
Dir. of Survey
Downstream
Length Surveyed
502.8 ft.
Total Length
502.8 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 14 0249 to 14 0248
MH: 14 0249MH: 14 0248downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02490 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start499.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish499.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish499.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish499.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish502.8 ft. AMH - Downstream Manhole, Survey Ends - 14 0248

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
499.8SSS
499.8DAGS
2SSS
2MGOMAG COAT
502.8AMH14 0248
0MWM
0AMH14 0249
499.8SRV
2DAGS
2SAP
0MWL
2SRV
499.8SAP

Properties (7)

additional_info
630069120121201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-12-02T01:35:09-08:00
documentation
PRO PIPE
is_lateral_inspection