Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2021, 10:50 AM
  • 01 0536_01 0535_12172021_025957.mp4

Date
12/17/2021
W/O
926527
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00206
PipeID
P01023
Time
2:50 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9641
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
FLORENCE-GRAHAM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_926527_TV01239_DEC2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
18 in.
Upstream MH
01 0536
Downstream MH
01 0535
Dir. of Survey
Downstream
Length Surveyed
164 ft.
Total Length
164 ft.
Structural Index
4
Structural Quick
4231
Structural Rating
11
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
17
Pipe schematic from manhole 01 0536 to 01 0535
MH: 01 0536MH: 01 0535downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 05360 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES9.2 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK11.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start57 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish57 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start82.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"108.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"161.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish161.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish164 ft. AMH - Downstream Manhole, Survey Ends - 01 0535164 ft. MGO - General Observation - COCKROACHES IN MH164 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    4.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - CONNECTION AT MH 6 O'CLOCK

    9.2 ft. - General Observation - CONNECTION AT MH 6 O'CLOCK

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    57 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    164 ft. - General Observation - COCKROACHES IN MH

Observations (17)

DistanceCodeObservation
164AMH01 0535
0MWM
9.2MGOCONNECTION AT MH 6 O'CLOCK
164MGOCOCKROACHES IN MH
57CM
4.3FM
0AMH01 0536
108.7TFC
82.1TFC
2DAGS
161.6FM
0MWL
57FM
161.6DAGS
150.9TFC
11.6CM
164MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630138121621203
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2021-12-17T02:50:54-08:00
documentation
PRO PIPE
is_lateral_inspection
false