Wastewater/Activity/PacpInspection/1.0Nov 16, 2021, 09:40 AM
  • H 1339_H 1338_11162021_015038.mp4

Date
11/16/2021
W/O
921627
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01184
PipeID
P25882
Time
1:40 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9500
Sewer Name
H JOINT OUTFALL H - UNIT 8L RELIEF
City
AZUSA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
WO_921627_TV22099_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1339
Downstream MH
H 1338
Dir. of Survey
Downstream
Length Surveyed
218.5 ft.
Total Length
218.5 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
326
Pipe schematic from manhole H 1339 to H 1338
MH: H 1339MH: H 1338downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 13390 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - - VCP -15.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start117.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start216.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish216.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - - VCP -216.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish216.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish218.5 ft. AMH - Downstream Manhole, Survey Ends - H 1338

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    117.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
216.2DAGS
15.9SSS- VCP -
15.9CM
0MWM
0AMHH 1339
117.7DAE
216.2SSS- VCP -
218.5AMHH 1338
2DAGS
0MWL
216.2CM
216.2DAE

Properties (8)

additional_info
630069111521201
custom_field_three
VCP SPALLING - LIGHT GREASE
custom_field_two
3
customer
1
datetime
2021-11-16T01:40:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39562