Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 12, 2021, 02:57 PM
  • 02 0108_02 0107_11122021_075508.mp4

Date
11/12/2021
W/O
922047
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00237
PipeID
P02275
Time
6:57 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9279
Sewer Name
02 BELLFLOWER TRUNK
City
BELLFOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_922047_TV02350_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
36 in.
Upstream MH
02 0108
Downstream MH
02 0107
Dir. of Survey
Downstream
Length Surveyed
366.4 ft.
Total Length
366.4 ft.
Structural Index
3
Structural Quick
5244
Structural Rating
88
O&M Index
2
O&M Quick
5143
O&M Rating
265
Overall Index
2
Overall Quick
Overall Rating
353
Pipe schematic from manhole 02 0108 to 02 0107
MH: 02 0108MH: 02 0107downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 01080 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0.1 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.4 ft. B - Broken, from 10 to 02 o'clock, within 8 inches of joint: YES7.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish19.7 ft. CM - Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES20.9 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: NO - AT TAP21.3 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"59.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.4 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES109.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES110.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"120.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES122.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.5 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES156.8 ft. FM - Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES173.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"175.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 69"189.5 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area, Start192.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS UNDER FLOW192.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start192.7 ft. MWM - Water Mark, 60 %of cross sectional area195.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES195.3 ft. MGO - General Observation - VIEW OBSTRUCTED BY WATER LEVEL207.5 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES217.4 ft. MWLS - Water Level, Sag in pipe, 25 %of cross sectional area, Finish223.9 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area, Start225.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish225.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start225.7 ft. MWM - Water Mark, 80 %of cross sectional area228.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES228.8 ft. MCU - Camera Underwater, Start235.7 ft. MCU - Camera Underwater, Finish236.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"238.3 ft. B - Broken, from 03 to 05 o'clock, within 8 inches of joint: YES240.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish240.4 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area, Finish250 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"273.3 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start277.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"322.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"329.4 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES330.7 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - HARDENED331.8 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish336.8 ft. OBZ - Obstacles Other, 10 %of cross sectional area, from 05 to 07 o'clock - HARD OBJECT UNDER FLOW349 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"352 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"362.5 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES364.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE364.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish366.4 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK366.4 ft. AMH - Downstream Manhole, Survey Ends - 02 0107

Observation photos (22)

  • General Observation - CONNECTION AT THE MH 3 OC'LOCK

    0 ft. - General Observation - CONNECTION AT THE MH 3 OC'LOCK

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 10 to 02 o'clock, within 8 inches of joint: YES

    7.4 ft. - Broken, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

    19.7 ft. - Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

  • Deposits Attached Ragging, 5 %of cross sectional area, at 12 o'clock,  , within 8 inches of joint: NO - AT TAP

    20.9 ft. - Deposits Attached Ragging, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: NO - AT TAP

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    100.4 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    109.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    120.4 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    132.5 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

    156.8 ft. - Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 25 %of cross sectional area, Start

    189.5 ft. - Water Level, Sag in pipe, 25 %of cross sectional area, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    192.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    195.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    207.5 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    225.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    228.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Broken, from 03 to 05 o'clock, within 8 inches of joint: YES

    238.3 ft. - Broken, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    273.3 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    329.4 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - HARDENED

    330.7 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - HARDENED

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    362.5 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (57)

DistanceCodeObservation
228.8FL
175.9TF
195.3MGOVIEW OBSTRUCTED BY WATER LEVEL
2DAGS
322.2TF
366.4MGOCONNECTION AT THE MH 9 OC'LOCK
195.2CM
109.3DAGS
207.5CM
189.5MWLS
59.8TF
364.8DSZSLUDGE
228.8MCU
156.8FM
4FM
110.5TF
236.6TFA
225.7DAGS
366.4AMH02 0107
352TF
20.9DARAT TAP
0.1MWM
223.9MWLS
0AMH02 0108
217.4MWLS
273.3MWLS
240.4DAGS
336.8OBZHARD OBJECT UNDER FLOW
0MWL
100.4CM
192.7DSZDEBRIS UNDER FLOW
86.8TF
7.4B
21.3TBA
225.7DAGS
277.1TF
329.4DAGS
173.2TFC
0MGOCONNECTION AT THE MH 3 OC'LOCK
225.7MWM
238.3TFA
235.7MCU
192.7DAGS
362.5FM
331.8MWLS
250TF
19.7CM
364.8DAGS
122.2TFA
120.4DAGS
330.7DAEHARDENED
7.4FM
238.3B
132.5CL
349TFC
192.7MWM
240.4MWLS

Properties (7)

additional_info
630074111221061
custom_field_three
BROKEN, SEVERE SAG
custom_field_two
1
customer
1
datetime
2021-11-12T06:57:34-08:00
documentation
PROPIPE
is_lateral_inspection
false