Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 6, 2021, 06:44 PM
  • 29 0402_29 0401_12062021_110841.mp4

Date
12/06/2021
W/O
926976
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01090
PipeID
P24439
Time
10:44 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9291
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_926976_TV29057_DEC2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0402
Downstream MH
29 0401
Dir. of Survey
Downstream
Length Surveyed
327.6 ft.
Total Length
327.6 ft.
Structural Index
3
Structural Quick
443L
Structural Rating
347
O&M Index
2
O&M Quick
2L11
O&M Rating
131
Overall Index
2
Overall Quick
Overall Rating
478
Pipe schematic from manhole 29 0402 to 29 0401
MH: 29 0402MH: 29 0401downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 04020 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES11.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.1 ft. FS - Fracture Spiral, from 03 to 10 o'clock, within 8 inches of joint: YES36.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN56.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"88.9 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES101.9 ft. FS - Fracture Spiral, from 03 to 08 o'clock, within 8 inches of joint: YES108.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN125.8 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN128.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4", 6"188.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"191.7 ft. RFJ - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YESR223.7 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN253.6 ft. FS - Fracture Spiral, from 05 to 08 o'clock, within 8 inches of joint: YES259.6 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN267.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN273.2 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN281.7 ft. FM - Fracture Multiple, from 04 to 09 o'clock, within 8 inches of joint: YES302.5 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start307.6 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish325 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish325.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.6 ft. AMH - Downstream Manhole, Survey Ends - 29 0401

Observation photos (9)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    9.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 03 to 10 o'clock, within 8 inches of joint: YES

    30.1 ft. - Fracture Spiral, from 03 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    88.9 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 03 to 08 o'clock, within 8 inches of joint: YES

    101.9 ft. - Fracture Spiral, from 03 to 08 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YESR

    191.7 ft. - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YESR

  • Fracture Spiral, from 05 to 08 o'clock, within 8 inches of joint: YES

    253.6 ft. - Fracture Spiral, from 05 to 08 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 04 to 09 o'clock, within 8 inches of joint: YES

    281.7 ft. - Fracture Multiple, from 04 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    302.5 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (30)

DistanceCodeObservation
259.6TBOPEN
125.8TBOPEN
325SSS
108.1TFOPEN
253.6FS
56.7TFA
36.1TFOPEN
273.2TBOPEN
30.1FS
327.6AMH29 0401
2SSS
267.6TFOPEN
281.7FM
9.7CM
128.6TFA
0MWL
88.9FM
0AMH29 0402
11.9CM
188.1TFA
0MGOCONNECTION AT MH 9 O'CLOCK
223.7TFOPEN
2DAGS
325.6CM
302.5FM
101.9FS
191.7RFJ
307.6FM
325DAGS
0MWM

Properties (7)

additional_info
630098120621061
custom_field_three
BROKEN PIPE/FRACTURES
custom_field_two
2
customer
1
datetime
2021-12-06T10:44:45-08:00
documentation
PROPIPE
is_lateral_inspection
false