Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2021, 07:23 AM
  • 22 0771_22 0770_11162021_233854.mp4

Date
11/16/2021
W/O
921719
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00822
PipeID
P17130
Time
11:23 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9541
Sewer Name
22 PUDDINGSTONE TRUNK, SECTION 3
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
WO_921719_TV22096_NOV2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0771
Downstream MH
22 0770
Dir. of Survey
Downstream
Length Surveyed
348.9 ft.
Total Length
348.9 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
483
Pipe schematic from manhole 22 0771 to 22 0770
MH: 22 0771MH: 22 0770downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 07710 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start96 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"141.2 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"172.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"193.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"241.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"246.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"290.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"346 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish346.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish346.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish348.9 ft. MGO - General Observation - ROACHES @ MH348.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0770

Observation photos (4)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    348.9 ft. - General Observation - ROACHES @ MH

Observations (21)

DistanceCodeObservation
193.3TFC
346SSS
348.9MGOROACHES @ MH
346.6SAP
246.1TFC
286.1TFC
2SSS
348.9AMH22 0770
2DAGS
0MWM
196.8TFC
0AMH22 0771
141.2TBA
0MGOROACHES @ MH
346.6DAGS
290.3TFC
172.3TFC
3.4SAP
96TFC
241.7TFC
0MWL

Properties (7)

additional_info
630069111621202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-11-16T23:23:54-08:00
documentation
PRO PIPE
is_lateral_inspection
false