Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2022, 10:17 AM
  • 16 0276_16 0275_1252022_025128.mp4

Date
01/25/2022
W/O
0931953
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00652
PipeID
P13318
Time
2:17 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2090R
Sewer Name
16 CHAPEL AVENUE TRUNK, SECTION 1
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Maintenance Related
Project
20220125MDM_CHAPEL_AVENUE_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
16 0276
Downstream MH
16 0275
Dir. of Survey
Downstream
Length Surveyed
168.2 ft.
Total Length
168.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
1
Overall Quick
Overall Rating
1
Pipe schematic from manhole 16 0276 to 16 0275
MH: 16 0276MH: 16 0275downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 2:35AM0 ft. MWM - Water Mark, 20 %of cross sectional area142.1 ft. RFJ - Roots Fine Joint, from 08 to 10 o'clock, within 8 inches of joint: YESR - 1%168.2 ft. AMH - Downstream Manhole, Survey Ends - 2:45AM

Observations (6)

DistanceCodeObservation
168.2AMH2:45AM
0MWL
0MGOConn. @ Mh, 9 O' Clock. Active
0AMH2:35AM
142.1RFJ1%
0MWM

Properties (5)

additional_info
ROOT EVALUATION ONLY
customer
LACSD
datetime
2022-01-25T02:17:46-08:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection
false