Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2022, 08:54 AM
  • B 1270_B 1269_1252022_011403.mp4

Date
01/25/2022
W/O
0932148
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01126
PipeID
P25165
Time
12:54 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2089R
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Maintenance Related
Project
20220125MDM_JOINT_OUTFALL_B_UNIT_6J
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 1270
Downstream MH
B 1269
Dir. of Survey
Downstream
Length Surveyed
355.4 ft.
Total Length
355.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
4131
O&M Rating
20
Overall Index
1
Overall Quick
Overall Rating
20
Pipe schematic from manhole B 1270 to B 1269
MH: B 1270MH: B 1269downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:55AM0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area4 ft. RMJ - Roots Medium Joint, from 08 to 02 o'clock, 10 %, within 8 inches of joint: YESR12 ft. RFJ - Roots Fine Joint, from 08 to 12 o'clock, within 8 inches of joint: YESR - 2%19.9 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 2%22.8 ft. MWM - Water Mark, 40 %of cross sectional area22.8 ft. MWL - Water Level, 10 %of cross sectional area41.9 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 2%107.3 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 1%130.2 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 1%138.8 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 2%152.5 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 2%171.5 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 2%173.5 ft. RFJ - Roots Fine Joint, from 01 to 05 o'clock, within 8 inches of joint: YESR - 2%176.3 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 1%194.1 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 1%254.2 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 2%338.6 ft. RFJ - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR - 1%355.4 ft. AMH - Downstream Manhole, Survey Ends - 1:15AM

Observation photos (1)

  • Roots Medium Joint, from 08 to 02 o'clock, 10 %, within 8 inches of joint: YESR

    4 ft. - Roots Medium Joint, from 08 to 02 o'clock, 10 %, within 8 inches of joint: YESR

Observations (20)

DistanceCodeObservation
22.8MWM
12RFJ2%
355.4AMH1:15AM
0AMH12:55AM
338.6RFJ1%
176.3RFJ1%
152.5RFJ2%
19.9RFJ2%
41.9RFJ2%
0MWM
171.5RFJ2%
22.8MWL
4RMJ
0MWL
254.2RFJ2%
130.2RFJ1%
173.5RFJ2%
107.3RFJ1%
138.8RFJ2%
194.1RFJ1%

Properties (4)

customer
LACSD
datetime
2022-01-25T00:54:12-08:00
documentation
MARTIN,OLIVER 111.CASTILLO
is_lateral_inspection
false