Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2021, 06:18 AM
  • 05 0926_05 0925_12142021_223252.mp4

Date
12/14/2021
W/O
926578
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00547
PipeID
P06158
Time
10:18 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9566
Sewer Name
05 120TH STREET EXTENSION TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_926578_TV05372_DEC2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0926
Downstream MH
05 0925
Dir. of Survey
Downstream
Length Surveyed
333.5 ft.
Total Length
333.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
330
Pipe schematic from manhole 05 0926 to 05 0925
MH: 05 0926MH: 05 0925downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 09262.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish16.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"99.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"152.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"208.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"257.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"309.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"333.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.5 ft. AMH - Downstream Manhole, Survey Ends - 05 0925333.5 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK333.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    16.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
47.8TFC
2.3SSS
0MWM
0MGOCONNECTION AT THE MH 3 OC'LOCK
152.5TFC
0MWL
333.5SSS
333.5AMH05 0925
208.8TFC
16.2SAV
99.3TFC
309.1TFC
16.2SAP
333.5MGOCONNECTION AT THE MH 3 OC'LOCK
333.5SAP
0AMH05 0926
2.3SAV
257.5TFC

Properties (7)

additional_info
630074121421201
custom_field_three
SURFACE SPALLING AGGREGATE VISIBLE
custom_field_two
2
customer
1
datetime
2021-12-14T22:18:41-08:00
documentation
PROPIPE
is_lateral_inspection
false