Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 10, 2021, 11:07 AM
  • 02 0133_02 0132_11102021_031754.mp4

Date
11/10/2021
W/O
921544
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00251
PipeID
P02435
Time
3:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9533
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
BELLFLOWER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_921544_TV02373_NOV2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
8 in.
Upstream MH
02 0133
Downstream MH
02 0132
Dir. of Survey
Downstream
Length Surveyed
61.9 ft.
Total Length
61.9 ft.
Structural Index
3
Structural Quick
513A
Structural Rating
41
O&M Index
3
O&M Quick
3A00
O&M Rating
36
Overall Index
3
Overall Quick
Overall Rating
77
Pipe schematic from manhole 02 0133 to 02 0132
MH: 02 0133MH: 02 0132downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 01330 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start59.8 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES61.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK61.9 ft. AMH - Downstream Manhole, Survey Ends - 02 013261.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish61.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

    59.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (10)

DistanceCodeObservation
2.1DSZ
0MWM
61.9MGOCONNECTION AT THE MH 9 OC'LOCK
59.8SRV
61.9AMH02 0132
61.9DSZ
2.1SAP
61.9SAP
0AMH02 0133
0MWL

Properties (7)

additional_info
630074110921204
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-11-10T03:07:12-08:00
documentation
PROPIPE
is_lateral_inspection
false