Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2022, 08:25 AM
  • 01 0343_01 0342_1122022_004828.mp4

Date
01/12/2022
W/O
0931893
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00215
PipeID
P00815
Time
12:25 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2076
Sewer Name
01 NADEAU TRUNK, SECTS 2&1
City
HUNTINGTON PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20220112MDM_NADEAU_TRUNK_SECTS_2_1
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
01 0343
Downstream MH
01 0342
Dir. of Survey
Downstream
Length Surveyed
260.9 ft.
Total Length
260.9 ft.
Structural Index
3
Structural Quick
4122
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 01 0343 to 01 0342
MH: 01 0343MH: 01 0342downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM2 ft. MGO - General Observation - MAG COAT 75% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG26.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCREYTE SEVERE AGG ATTACHED203.5 ft. MGO - General Observation - 95% MAG COAT260.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED260.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG260.2 ft. MGO - General Observation - 95% MAG COAT FINISH260.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE260.9 ft. AMH - Downstream Manhole, Survey Ends - 1:00AM

Observation photos (5)

  • General Observation - MAG COAT 75% START

    2 ft. - General Observation - MAG COAT 75% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCREYTE SEVERE AGG ATTACHED

    26.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCREYTE SEVERE AGG ATTACHED

  • General Observation - 95% MAG COAT

    203.5 ft. - General Observation - 95% MAG COAT

Observations (13)

DistanceCodeObservation
0MWM
203.5MGO95% MAG COAT
0MWL
2MGOMAG COAT 75% START
2SSSBLISTERING PEELING CONCRETE
26.5SSSPEELING CONCREYTE SEVERE AGG ATTACHED
2SAMSEVERE AGG
260.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
260.2SAMSEVERE AGG
0AMH12:35AM
260.9AMH1:00AM
260.2MGO95% MAG COAT FINISH
260.2SSSBLISTERING PEELING CONCRETE

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED-75% MAG COAT
custom_field_two
2
customer
LACSD
datetime
2022-01-12T00:25:05-08:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection
false