Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2022, 06:49 PM
  • 08 0474_08 0596_132022_062455.mp4

Date
01/03/2022
W/O
PENDING
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00025
PipeID
P00531
Time
10:49 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2068
Sewer Name
08 216TH STREET RELOCATION TRUNK
City
CARSON
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
13
Purpose
Maintenance Related
Project
20220103AM_216TH_STREET_RELOCATION_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
08 0474
Downstream MH
08 0596
Dir. of Survey
Downstream
Length Surveyed
872 ft.
Total Length
872 ft.
Structural Index
4
Structural Quick
5331
Structural Rating
20
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
24
Pipe schematic from manhole 08 0474 to 08 0596
MH: 08 0474MH: 08 0596downstream0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. MWL - Water Level, 55 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins2 ft. MGO - General Observation - 65% MAGNESIUM HYDROXIDE COATING FROM 09 TO 03 O'CLOCK, START,2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.1 ft. SMW - Surface Missing Wall, at 01 o'clock, within 8 inches of joint: YES - POSSIBLE23 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MISSING AND BROKEN31.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"76.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"132.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"216.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"226.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN292.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish292.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish292.6 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - MISSING AND BROKEN292.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish871 ft. MGO - General Observation - 65% MAGNESIUM HYDROXIDE COATING FROM 09 TO 03 O'CLOCK, FINISH871 ft. MGO - General Observation - ACTIVE CONNECTION INSIDE THE MANHOLE AT 09 O'CLOCK872 ft. AMH - Downstream Manhole, Survey Ends - 1:11 PM - FOOTAGE COUNTER WAY OFF!

Observations (21)

DistanceCodeObservation
76.4TFA
9.1SMWPOSSIBLE
2MGO65% MAGNESIUM HYDROXIDE COATING FROM 09 TO 03 O'CLOCK, START,
0MWM
871MGO65% MAGNESIUM HYDROXIDE COATING FROM 09 TO 03 O'CLOCK, FINISH
0MWL
2SAV
2SSS
292.6SRV
226.5TFOPEN
216.5TFA
871MGOACTIVE CONNECTION INSIDE THE MANHOLE AT 09 O'CLOCK
31.1TFA
872AMH1:11 PM - FOOTAGE COUNTER WAY OFF!
292.6SAV
292.6SRCMISSING AND BROKEN
23SRCMISSING AND BROKEN
132.7TFA
0AMH
292.6SSS
2SRV

Properties (7)

additional_info
FOOTAGE COUNTER WAY OFF
custom_field_three
MISSING AND BROKEN REBAR THROUGHOUT THE REACH
custom_field_two
1
customer
LACSD
datetime
2022-01-03T10:49:36-08:00
documentation
MIRANDA, SHADLER, IGNACIO, RUVALCABA
is_lateral_inspection
false