Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 10, 2021, 07:54 AM
  • 18 0305_18 0304_12102021_000854.mp4

Date
12/09/2021
W/O
926759
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00683
PipeID
P14136
Time
11:54 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9624
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_926759_TV18098_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0304
Downstream MH
18 0305
Dir. of Survey
Upstream
Length Surveyed
405.5 ft.
Total Length
405.5 ft.
Structural Index
3
Structural Quick
5M3O
Structural Rating
742
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
744
Pipe schematic from manhole 18 0304 to 18 0305
MH: 18 0304MH: 18 0305upstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Ends - 18 03051.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish36.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN241.7 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 6" - ACTIVE286.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"334.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"347.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start391.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"399.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start403.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start403.5 ft. MGO - General Observation - 70% MAG COAT405.5 ft. MWL - Water Level, 20 %of cross sectional area405.5 ft. AMH - Downstream Manhole, Survey Begins - 18 0304405.5 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 70% MAG COAT

    2 ft. - General Observation - 70% MAG COAT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    58.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    405.5 ft. - General Observation - ROACHES @ MH

Observations (21)

DistanceCodeObservation
405.5MGOROACHES @ MH
403.6SRV
368.9TFC
320.4TFC
0MWL
0AMH18 0304
215.9TFC
14.2TFC
119.3TFC
2SSS
2MGO70% MAG COAT
403.6SAP
163.8TBIACTIVE
58.3SRV
403.6SSS
405.5AMH18 0305
6.3SAP
70.8TFC
167.3TFOPEN
272TFC
0MWM

Properties (7)

additional_info
630138120921201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-12-09T23:54:11-08:00
documentation
PRO PIPE
is_lateral_inspection