H 0106_H 0105_1112022_004907.mp4
2 ft. - General Photograph - MISSING LONG CIRCUM REBAR
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE & SOIL
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Reinforcement Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR CORRODED & MISSING
67.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - CORROSION BEYOUND REBAR
110.3 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CORRISON BEYOUND REBAR
203.1 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE SOIL
203.1 ft. - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO - SLUDGE SOIL
203.9 ft. - General Observation - ZOOM DOWNSTREAM TO BLOCKAGE
| Distance | Code | Observation |
|---|---|---|
| 2 | MGP | MISSING LONG CIRCUM REBAR |
| 79 | SRC | CORROSION BEYOUND REBAR |
| 67.6 | SRC | CORROSION BEYOUND REBAR |
| 203.1 | SAM | SEVERE AGG |
| 203.1 | DSZ | SLUDGE SOIL |
| 203.1 | SRP | LONG CIRCUM REBAR CORRODED MISSING |
| 0 | MWL | NO FLOW STOPLOG UPSTREAM |
| 203.1 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 203.9 | MGO | ZOOM DOWNSTREAM TO BLOCKAGE |
| 134.9 | DSZ | BRICK UNDER SLUDGE |
| 0 | AMH | 12:40AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | DSZ | SLUDGE & SOIL |
| 2 | SAM | SEVERE AGG |
| 110.3 | SRC | CORRISON BEYOUND REBAR |
| 2 | SRP | LONG CIRCUM REBAR CORRODED & MISSING |
| 203.1 | DSZ | SLUDGE SOIL |