Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 22, 2021, 11:56 AM
  • H 0106_H 0105_12222021_044626.mp4

Date
12/22/2021
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00165
PipeID
P10558
Time
3:56 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2059
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
HUNINGTON PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Maintenance Related
Project
20211222MDM_JOINT_OUTFALL_H_UNIT_1F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
H 0105
Downstream MH
H 0106
Dir. of Survey
Upstream
Length Surveyed
207.1 ft.
Total Length
207.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4131
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole H 0105 to H 0106
MH: H 0105MH: H 0106upstream0 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - SLUDGE(POSSIBLE SOIL)(ZOOM APPOX 60'0 ft. MSA - Survey Abandoned - 30% SLUDGE(POSSIBLE SOIL)0 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE5 ft. MGP - General Photograph - SLUDGE POSSOBLE SOIL131.9 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE (POSSIBLE SOIL)131.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE(POSSIBLE SOIL)205.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE(207.1 ft. MWL - Water Level, 10 %of cross sectional area - NO FLOW (SLUDGE207.1 ft. MWM - Water Mark, 40 %of cross sectional area207.1 ft. AMH - Upstream Manhole, Survey Begins - 4:45AM

Observation photos (3)

  • General Photograph - SLUDGE POSSOBLE SOIL

    202.1 ft. - General Photograph - SLUDGE POSSOBLE SOIL

  • Deposits Settled Other,  30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES - SLUDGE(POSSIBLE SOIL)(ZOOM APPOX 60'

    207.1 ft. - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - SLUDGE(POSSIBLE SOIL)(ZOOM APPOX 60'

  • Survey Abandoned - 30% SLUDGE(POSSIBLE SOIL)

    207.1 ft. - Survey Abandoned - 30% SLUDGE(POSSIBLE SOIL)

Observations (10)

DistanceCodeObservation
207.1DSZSLUDGE(POSSIBLE SOIL)(ZOOM APPOX 60'
75.2DSZSLUDGE (POSSIBLE SOIL)
2DSZSLUDGE(
0MWLNO FLOW (SLUDGE
202.1MGPSLUDGE POSSOBLE SOIL
0MWM
75.2DSZSLUDGE(POSSIBLE SOIL)
207.1MSA30% SLUDGE(POSSIBLE SOIL)
207.1DSZSLUDGE
0AMH4:45AM

Properties (4)

customer
LACSD
datetime
2021-12-22T03:56:22-08:00
documentation
MARTIN,REVELES,CASTILLO
is_lateral_inspection
false