Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2021, 08:46 AM
  • 02 1281_02 1280_11082021_011448.mp4

Date
11/08/2021
W/O
921813
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00238
PipeID
P03796
Time
12:46 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9527
Sewer Name
02 BELVEDERE TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_921813_TV02239_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
15 in.
Upstream MH
02 1281
Downstream MH
02 1280
Dir. of Survey
Downstream
Length Surveyed
266.2 ft.
Total Length
266.2 ft.
Structural Index
3
Structural Quick
3J28
Structural Rating
175
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
175
Pipe schematic from manhole 02 1281 to 02 1280
MH: 02 1281MH: 02 1280downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 128111 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES11 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES11.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES81.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES118 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES147 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES158 ft. CM - Crack Multiple, from 11 to 12 o'clock, within 8 inches of joint: YES186.1 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES188.1 ft. CM - Crack Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES195.1 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES266.2 ft. AMH - Downstream Manhole, Survey Ends - 02 1280266.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish266.2 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
186.1CL
0MWM
188.1CM
0MWL
147CL
195.1CL
0MGOCONNECTION AT THE MH 9 OC'LOCK
266.2AMH02 1280
11CL
118CL
62.1CL
0AMH02 1281
11.4CM
266.2CM
158CM
11CL
81.1CL
266.2MGOCONNECTION AT THE MH 9 OC'LOCK

Properties (7)

additional_info
630074110821001
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-11-08T00:46:23-08:00
documentation
PROPIPE
is_lateral_inspection
false