Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 22, 2021, 08:03 AM
  • 32 0248_32 0247A_10222021_010805.mp4

Date
10/22/2021
W/O
916876
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00914
PipeID
P24260
Time
1:03 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9470
Sewer Name
32 DISTRICT #32 MAIN RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
WO_916876_TV32014_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
32 0248
Downstream MH
32 0247A
Dir. of Survey
Downstream
Length Surveyed
54.8 ft.
Total Length
54.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2A00
O&M Rating
20
Overall Index
2
Overall Quick
Overall Rating
20
Pipe schematic from manhole 32 0248 to 32 0247A
MH: 32 0248MH: 32 0247Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 02480 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start52.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish52.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK54.8 ft. AMH - Downstream Manhole, Survey Ends - 32 0247A

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
2DAGS
0AMH32 0248
52.1DAGS
0MWM
54.8AMH32 0247A
52.1MGOCONNECTION AT MH 3 O'CLOCK
0MWL

Properties (7)

additional_info
630069102121201
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2021-10-22T01:03:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false