Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 5, 2021, 06:59 AM
  • 22 0844_22 0843_11042021_231434.mp4

Date
11/04/2021
W/O
921560
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00802
PipeID
P17209
Time
11:59 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9486
Sewer Name
22 DALTON TRUNK, SECTS 1&2
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_921560_TV22172_NOV2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0844
Downstream MH
22 0843
Dir. of Survey
Downstream
Length Surveyed
442.8 ft.
Total Length
442.8 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
440
O&M Index
2
O&M Quick
412Q
O&M Rating
180
Overall Index
2
Overall Quick
Overall Rating
620
Pipe schematic from manhole 22 0844 to 22 0843
MH: 22 0844MH: 22 0843downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 08440 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start210.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"250.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"323 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"363.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"427.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"440.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish440.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish440.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish442.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE442.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0843

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    442.8 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
442.8MGOCOCKROACHES IN MANHOLE
250.6TFA
0AMH22 0844
210.4TFA
2DAGS
427.2TFA
0MGOCONNECTION AT MH 9 O'CLOCK
440.5SAP
440.5DAGS
0MGOCOCKROACHES IN MANHOLE
323TFC
0MWL
2SAP
442.8AMH22 0843
440.5SSS
0MWM
363.6TBA
2SSS

Properties (7)

additional_info
630069110421201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-11-04T23:59:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false