Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2021, 11:32 AM
  • B 0380_B 0379_12202021_033327.mp4

Date
12/20/2021
W/O
0931355
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00091
PipeID
P08892
Time
3:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2056
Sewer Name
JOINT OUTFALL B-UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20211217MDM_JOINT_B_UNIT_5A
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
B 0380
Downstream MH
B 0379
Dir. of Survey
Downstream
Length Surveyed
327.9 ft.
Total Length
327.9 ft.
Structural Index
3
Structural Quick
3321
Structural Rating
11
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole B 0380 to B 0379
MH: B 0380MH: B 0379downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:55AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - 95% MAG COAT START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG126.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG298.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG327.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG327.4 ft. MGO - General Observation - 95% MAG COAT FINISH327.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING BCONCRETE UNDER MAG COAT327.9 ft. AMH - Downstream Manhole, Survey Ends - 4:20AM

Observation photos (5)

  • General Observation - 95% MAG COAT START

    0 ft. - General Observation - 95% MAG COAT START

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    126.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    298.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (12)

DistanceCodeObservation
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
2SAPSEVERE AGG
327.4SAPSEVERE AGG
298.8SAPSEVERE AGG
0AMH3:55AM
0MWL
327.4MGO95% MAG COAT FINISH
0MWM
327.4SSSBLISTERING PEELING BCONCRETE UNDER MAG COAT
327.9AMH4:20AM
0MGO95% MAG COAT START
126.1SAPSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG PROJECTING -955 MAG COAT
custom_field_two
2
customer
LACSD
datetime
2021-12-20T03:32:17-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false