Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2021, 11:47 AM
  • B 0385_B 0384_12182021_040036.mp4

Date
12/18/2021
W/O
0931355
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00091
PipeID
P08897
Time
3:47 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2055
Sewer Name
JOINT OUTFALL B-UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20211217MDM_JOINT_B_UNIT_5A
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
B 0385
Downstream MH
B 0384
Dir. of Survey
Downstream
Length Surveyed
268.9 ft.
Total Length
268.9 ft.
Structural Index
3
Structural Quick
3422
Structural Rating
16
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole B 0385 to B 0384
MH: B 0385MH: B 0384downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:00AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG6.3 ft. MGO - General Observation - MAG COAT 95% START77.6 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE202.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, - SEVERE AGG268.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT268.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC268.2 ft. MGO - General Observation - MAG COAT 95% FINISH268.9 ft. AMH - Downstream Manhole, Survey Ends - 4:20AM

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 95% START

    6.3 ft. - General Observation - MAG COAT 95% START

  • Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    77.6 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES,  - SEVERE AGG

    202.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, - SEVERE AGG

Observations (12)

DistanceCodeObservation
268.2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
268.2SAPSEVERE AGG SPORATIC
268.2MGOMAG COAT 95% FINISH
77.6SSSBLISTERING CONCRETE
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
0MWM
202.5SAPSEVERE AGG
0MWL
2SAPSEVERE AGG
6.3MGOMAG COAT 95% START
268.9AMH4:20AM
0AMH4:00AM

Properties (6)

custom_field_three
SEVERE AGG PROJECTING- 95% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2021-12-18T03:47:11-08:00
documentation
MARTIN,REVELES,OLIVER 111
is_lateral_inspection
false