Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2021, 12:11 PM
  • B 0391_B 0390_12172021_041456.mp4

Date
12/17/2021
W/O
0931355
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00091
PipeID
P08903
Time
4:11 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2054
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20211217MDM_JOINT_B_UNIT_5A
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
B 0391
Downstream MH
B 0390
Dir. of Survey
Downstream
Length Surveyed
94.7 ft.
Total Length
94.7 ft.
Structural Index
3
Structural Quick
4221
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole B 0391 to B 0390
MH: B 0391MH: B 0390downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 98% START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT26.2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG94.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT94.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG94.1 ft. MGO - General Observation - MAG COAT 98% FINISH94.7 ft. AMH - Downstream Manhole, Survey Ends - 4:25AM

Observation photos (4)

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 98% START

    2 ft. - General Observation - MAG COAT 98% START

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    26.2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (11)

DistanceCodeObservation
2SAMSEVERE AGG
0AMH4:15AM
2MGOMAG COAT 98% START
94.1SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
0MWL
94.1SAMSEVERE AGG
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
94.1MGOMAG COAT 98% FINISH
94.7AMH4:25AM
26.2SAMSEVERE AGG
0MWM

Properties (6)

custom_field_three
SEVERE AGG MISSING-98% MAG COST
custom_field_two
3
customer
LACSD
datetime
2021-12-17T04:11:58-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false