- Date
- 12/16/2021
- W/O
- 0921548
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00075
- PipeID
- P08679
- Time
- 12:30 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H2052
- Sewer Name
- B JOINT OUTFALL B - UNIT 1D
- City
- PICO RIVERIA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 15
- Purpose
- Capital Improvement Program Assesment
- Project
- 20211215MDM_JOINT_OUTFALL_B_UNIT_1D
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 57 in.
- Upstream MH
- B 193
- Downstream MH
- B 192
- Dir. of Survey
- Downstream
- Length Surveyed
- 885.8 ft.
- Total Length
- 885.8 ft.
- Structural Index
- 3
- Structural Quick
- 5135
- Structural Rating
- 22
- O&M Index
- 3
- O&M Quick
- 4121
- O&M Rating
- 6
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 28
Pipe schematic from manhole B 193 to B 192 Observation photos (5)

2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

2 ft. - General Observation - MAG COAT 95% START

2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

38.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

298.6 ft. - Surface Aggregate Projecting, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG