Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2021, 12:08 PM
Date
12/15/2021
W/O
0921548
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00075
PipeID
P08677
Time
4:08 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2052
Sewer Name
B JOINT OUTFALL B - UNIT 1D
City
PICO RIVERIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
15
Purpose
Capital Improvement Program Assesment
Project
20211215MDM_JOINT_OUTFALL_B_UNIT_1D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
B 0191
Downstream MH
B 0190
Dir. of Survey
Downstream
Length Surveyed
493.9 ft.
Total Length
493.9 ft.
Structural Index
3
Structural Quick
4121
Structural Rating
6
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole B 0191 to B 0190
MH: B 0191MH: B 0190downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 95% START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT169.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open298.5 ft. MGO - General Observation - MAG COAT 90%372.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open493.3 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SE4VERE AGG UNDER MAG COAT493.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish493.3 ft. MGO - General Observation - MAG COAT 90% FINISH493.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT493.9 ft. AMH - Downstream Manhole, Survey Ends - 4:55AM

Observations (15)

DistanceCodeObservation
0AMH4:15AM
298.5MGOMAG COAT 90%
0DAGS
493.3SAMSE4VERE AGG UNDER MAG COAT
2SAMSEVERE AGG UNDER MAG COAT
0MWL
493.9AMH4:55AM
0MWM
2MGOMAG COAT 95% START
493.3DAGS
372.7TFOpen
169.7TFOpen
493.3MGOMAG COAT 90% FINISH
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
493.3SSSBLISTERING PEELING CONCRETE UNDER MAG COAT

Properties (6)

custom_field_three
SEVERE AGG MISSING -90% MAG COAT
custom_field_two
2
customer
LACSD
datetime
2021-12-15T04:08:35-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false