Search
Uploads
Inspections
Wastewater/Activity/PacpInspection/1.0
Dec 3, 2021, 05:15 PM
Date
12/03/2021
W/O
PENDING
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00349
PipeID
P02991
Time
9:15 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
—
Pre-Cleaning
Not Known
Media Label
I0378
Sewer Name
02 DISTRICT #2 INTERCEPTOR TRUNK
City
COMMERCE
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Maintenance Related
Project
20211203MI_DISTRICT_2_INTERCEPTOR_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
02 1419
Downstream MH
02 1420
Dir. of Survey
Upstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
—
Overall Rating
10
Pipe schematic from manhole 02 1419 to 02 1420
MH: 02 1419
MH: 02 1420
upstream
0 ft. MSA - Survey Abandoned - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON
0.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES
0.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES
2.1 ft. AMH - Downstream Manhole, Survey Begins - 09:30 AM
2.1 ft. MWL - Water Level, 25 %of cross sectional area
2.1 ft. MWM - Water Mark, 100 %of cross sectional area
2.1 ft. MGO - General Observation - NORTH WEST AIRLINE
2.1 ft. MGO - General Observation - NORTH AIRLINE
All inspections of P02991
Work order PENDING
Observations (8)
Distance
Code
Observation
0
AMH
09:30 AM
0
MWL
—
0
MWM
—
0
MGO
NORTH WEST AIRLINE
0
MGO
NORTH AIRLINE
2
SSS
—
2
SAV
—
2.1
MSA
VIEW OF THE UPLEG PIPE OF THE D/S SIPHON
Properties (7)
additional_info
CHECKING THE STATUS OF POSSIBLE SINKHOLE
custom_field_three
SURFACE SPALLING/ AGGREGATE
custom_field_two
3
customer
LACSD
datetime
2021-12-03T09:15:00-08:00
documentation
IGNACIO, BRAR, MIRANDA
is_lateral_inspection
false