Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 13, 2021, 08:48 AM
  • 20 0357_20 0356_10132021_020112.mp4

Date
10/13/2021
W/O
916317
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00756
PipeID
P19306
Time
1:48 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9462
Sewer Name
20 56TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
09
Purpose
Routine Assessment
Project
WO_916317_TV20013_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0357
Downstream MH
20 0356
Dir. of Survey
Downstream
Length Surveyed
382.3 ft.
Total Length
382.3 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
412N
O&M Rating
156
Overall Index
2
Overall Quick
Overall Rating
158
Pipe schematic from manhole 20 0357 to 20 0356
MH: 20 0357MH: 20 0356downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 03572 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start64 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"113.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"215.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"239.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"264.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"288.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"316.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"342.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"362 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"380 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - THROUGHOUT380.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish382.3 ft. AMH - Downstream Manhole, Survey Ends - 20 0356

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
239.8TFC
288.3TFC
166.8TFC
382.3AMH20 0356
0MWL
264.3TFC
113.6TFC
342.1TFC
380SSSTHROUGHOUT
362TFC
0MWM
88.7TFC
137.5TFC
215.5TFC
64TFC
2DAGS
380.5DAGS
190.9TFC
0AMH20 0357
316.9TFC

Properties (7)

additional_info
630069101221202
custom_field_three
LIGHT GREASE/SPALLING
custom_field_two
3
customer
1
datetime
2021-10-13T01:48:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false