Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2021, 06:07 AM
  • 20 0262_20 0261_10132021_232106.mp4

Date
10/13/2021
W/O
916672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19229
Time
11:07 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9463
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_916672_TV20009_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0262
Downstream MH
20 0261
Dir. of Survey
Downstream
Length Surveyed
334 ft.
Total Length
334 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
462
Pipe schematic from manhole 20 0262 to 20 0261
MH: 20 0262MH: 20 0261downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02620 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"154.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"305.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"331.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish331.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish331.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish334 ft. AMH - Downstream Manhole, Survey Ends - 20 0261

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
106.4TFC
154.4TFC
305.7TFC
2SSS
331.5SSS
6.1TFC
253.7TFC
0AMH20 0262
0MWL
2SAP
0MWM
2MGO45% MAG COAT
331.5DAGS
334AMH20 0261
331.5SAP
54.2TFC
2DAGS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (7)

additional_info
630069101321201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-10-13T23:07:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false