Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2021, 06:54 AM
  • 20 0261_20 0260_10142021_000921.mp4

Date
10/13/2021
W/O
916672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19228
Time
11:54 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9463
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_916672_TV20009_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0261
Downstream MH
20 0260
Dir. of Survey
Downstream
Length Surveyed
373.7 ft.
Total Length
373.7 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
372
O&M Index
2
O&M Quick
2N00
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
520
Pipe schematic from manhole 20 0261 to 20 0260
MH: 20 0261MH: 20 0260downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02610 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start22.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"171 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"274.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"321.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"372.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish372.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish372.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish373.7 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE373.7 ft. AMH - Downstream Manhole, Survey Ends - 20 0260373.7 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2SAP
372.4SSS
372.4SAP
373.7MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
2MGO35% MAG COAT
22.5TFC
0AMH20 0261
0MWL
171TFC
122.2TFC
274.3TFC
321.6TFC
0MWM
373.7AMH20 0260
222.3TFC
373.7MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SSS
372.4DAGS

Properties (7)

additional_info
630069101321201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-10-13T23:54:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false