Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 12, 2021, 06:07 AM
  • 20 0256_20 0255_10112021_231901.mp4

Date
10/11/2021
W/O
916672
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19223
Time
11:07 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9459
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_916672_TV20009_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0256
Downstream MH
20 0255
Dir. of Survey
Downstream
Length Surveyed
286.9 ft.
Total Length
286.9 ft.
Structural Index
2
Structural Quick
3J2U
Structural Rating
389
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
2
Overall Quick
Overall Rating
505
Pipe schematic from manhole 20 0256 to 20 0255
MH: 20 0256MH: 20 0255downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02560 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 55% MAG COAT25 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start25 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES49.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"245.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"284 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish284.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish284.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish284.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish286.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0255

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
245.8TFC
2SSS
25MWLS
0AMH20 0256
49.1TFC
2SAP
284.5SSS
284MWLS
97.9TFC
0MWL
286.9AMH20 0255
284.5SAP
284.5DAGS
150TFC
198TFC
25DAGS
2DAGS
2MGO55% MAG COAT
0MWM

Properties (7)

additional_info
630069101121201
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-10-11T23:07:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false