Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2021, 11:24 AM
  • 22 0133_22 0132_11092021_033637.mp4

Date
11/09/2021
W/O
921516
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00805
PipeID
P16375
Time
3:24 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9489
Sewer Name
22 DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
WO_921516_TV22033_NOV2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0133
Downstream MH
22 0132
Dir. of Survey
Downstream
Length Surveyed
366.9 ft.
Total Length
366.9 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
360
O&M Index
2
O&M Quick
2M00
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
504
Pipe schematic from manhole 22 0133 to 22 0132
MH: 22 0133MH: 22 0132downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 01332 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.2 ft. MGO - General Observation - MAG COATING THROUGHOUT4.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"62.8 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"117.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"364.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish366.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE366.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0132366.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    4.2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    366.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
2SSS
62.8TFA
364.3SAP
4.2MGOMAG COATING THROUGHOUT
0MGOCOCKROACHES IN MANHOLE
364.3SSS
7.9TFA
0MWL
0MWM
366.9MGOCOCKROACHES IN MANHOLE
364.3DAGS
4.2SAP
117.1TFA
2DAGS
366.9AMH22 0132
366.9MGOCONNECTION AT MH 3 O'CLOCK
0AMH22 0133

Properties (7)

additional_info
630069110821201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-11-09T03:24:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false