Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2021, 11:18 AM
  • 22 1445_22 0153_11082021_033436.mp4

Date
11/08/2021
W/O
921516
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00805
PipeID
P16396
Time
3:18 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9488
Sewer Name
22 DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
WO_921516_TV22033_NOV2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0153
Downstream MH
22 1445
Dir. of Survey
Upstream
Length Surveyed
367.2 ft.
Total Length
367.2 ft.
Structural Index
3
Structural Quick
5232
Structural Rating
20
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
24
Pipe schematic from manhole 22 0153 to 22 1445
MH: 22 0153MH: 22 1445upstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 22 14450 ft. MGO - General Observation - COCKROACHES IN MANHOLE1.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish4.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish6.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish7.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish28.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"33.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start77.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"236.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"326.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"365.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start365.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start365.2 ft. MGO - General Observation - MAG COATING THROUGHOUT365.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start367.2 ft. MWL - Water Level, 15 %of cross sectional area367.2 ft. MWM - Water Mark, 30 %of cross sectional area367.2 ft. AMH - Downstream Manhole, Survey Begins - 22 0153367.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    333.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    367.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (21)

DistanceCodeObservation
131.1TFA
359.4SRV
0MWL
367.2MGOCONNECTION AT MH 9 O'CLOCK
289.8TFC
365.9DAGS
2SAP
360.9SSS
367.2AMH22 1445
367.2MGOCOCKROACHES IN MANHOLE
2SSS
362.7SAP
0MWM
333.4SRV
0AMH22 0153
2MGOMAG COATING THROUGHOUT
2DAGS
338.5TFC
0MGOCOCKROACHES IN MANHOLE
241.5TFC
40.4TFC

Properties (7)

additional_info
630069110821001
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-11-08T03:18:47-08:00
documentation
PRO PIPE
is_lateral_inspection
false