Wastewater/Activity/PacpInspection/1.0Oct 7, 2021, 06:50 AM
  • 20 0335_20 0721_10072021_000016.mp4

Date
10/06/2021
W/O
916520
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00755
PipeID
P25671
Time
11:50 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9455
Sewer Name
20 45TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_916520_TV20061_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0721
Downstream MH
20 0335
Dir. of Survey
Upstream
Length Surveyed
107.1 ft.
Total Length
107.1 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
105
O&M Index
2
O&M Quick
2C00
O&M Rating
42
Overall Index
2
Overall Quick
Overall Rating
147
Pipe schematic from manhole 20 0721 to 20 0335
MH: 20 0721MH: 20 0335upstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Ends - 20 03351.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish38.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"38.8 ft. MWM - Water Mark, 15 %of cross sectional area38.8 ft. MWL - Water Level, 5 %of cross sectional area62.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start105.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start105.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start105.1 ft. MGO - General Observation - 35% MAG COAT107.1 ft. MWM - Water Mark, 25 %of cross sectional area107.1 ft. MWL - Water Level, 20 %of cross sectional area107.1 ft. AMH - Downstream Manhole, Survey Begins - 20 0721

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
44.2TFC
0MWM
105.7DAGS
107.1MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SAP
2DAGS
105.7SAP
68.3TFC
105.7SSS
68.3MWM
0MWL
2SSS
2MGO35% MAG COAT
19.2TFC
107.1AMH20 0335
0AMH20 0721
68.3MWL

Properties (7)

additional_info
630069100621201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-10-06T23:50:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false