Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 7, 2021, 09:12 AM
  • 20 0324_20 0021_10072021_022448.mp4

Date
10/07/2021
W/O
916520
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00755
PipeID
P19273
Time
2:12 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9455
Sewer Name
20 45TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_916520_TV20061_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0324
Downstream MH
20 0021
Dir. of Survey
Downstream
Length Surveyed
443.5 ft.
Total Length
443.5 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
440
O&M Index
2
O&M Quick
2Q00
O&M Rating
176
Overall Index
2
Overall Quick
Overall Rating
616
Pipe schematic from manhole 20 0324 to 20 0021
MH: 20 0324MH: 20 0021downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 03240 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"92.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"170.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"242.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"308.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"393.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"440.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish440.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish440.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish443.5 ft. MGO - General Observation - CONN @ MH 5 O'CLOCK/ACTIVE443.5 ft. AMH - Downstream Manhole, Survey Ends - 20 0021

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
440.7DAGS
0MWL
242.8TFC
0AMH20 0324
443.5MGOCONN @ MH 5 O'CLOCK/ACTIVE
0MWM
2SSS
2SAP
2MGO35% MAG COAT
443.5AMH20 0021
170.1TFC
440.7SSS
92.5TFC
308.4TFC
2DAGS
393.7TFC
15.1TFC
440.7SAP

Properties (7)

additional_info
630069100621201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-10-07T02:12:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false