Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2021, 08:39 AM
  • H 0902_H 0901_09282021_014840.mp4

Date
09/28/2021
W/O
916634
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00192
PipeID
P16437
Time
1:39 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9386
Sewer Name
H JOINT OUTFALL H - UNIT 8J
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_916634_TV22153_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
H 0902
Downstream MH
H 0901
Dir. of Survey
Downstream
Length Surveyed
191.2 ft.
Total Length
191.2 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
181
O&M Index
2
O&M Quick
412F
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole H 0902 to H 0901
MH: H 0902MH: H 0901downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 09020 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start43 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"73.2 ft. MWL - Water Level, 10 %of cross sectional area78.1 ft. MWM - Water Mark, 25 %of cross sectional area149.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"188.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish188.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish188.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish191.2 ft. AMH - Downstream Manhole, Survey Ends - H 0901191.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0.1 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    191.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (17)

DistanceCodeObservation
15.8SSS
43TFC
0.1MGOCOCKROACHES IN MANHOLE
0AMHH 0902
191.2AMHH 0901
0MWM
78.1MWM
0MWL
191.2MGOCOCKROACHES IN MANHOLE
2SAP
188.4DAGS
73.2MWL
188.4SAP
149.7TFC
188.4SSS
2DAGS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630069092721204
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-09-28T01:39:02-07:00
documentation
PRO PIPE
is_lateral_inspection
false