Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2021, 08:48 AM
  • H 0901_H 0900_09282021_015744.mp4

Date
09/28/2021
W/O
916634
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00192
PipeID
P16436
Time
1:48 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9386
Sewer Name
H JOINT OUTFALL H - UNIT 8J
City
WEST COVINA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_916634_TV22153_OCT2021
Sewer Type
Gravity
Material
NRCP
Shape
Square
Height
15 in.
Width
15 in.
Upstream MH
H 0901
Downstream MH
H 0900
Dir. of Survey
Downstream
Length Surveyed
133.5 ft.
Total Length
133.5 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
78
O&M Index
2
O&M Quick
422D
O&M Rating
60
Overall Index
3
Overall Quick
Overall Rating
138
Pipe schematic from manhole H 0901 to H 0900
MH: H 0901MH: H 0900downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 09012 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start32.9 ft. MWL - Water Level, 35 %of cross sectional area32.9 ft. MWM - Water Mark, 60 %of cross sectional area98.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"99.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"102.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"131.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish131.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish133.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE133.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK133.5 ft. AMH - Downstream Manhole, Survey Ends - H 0900

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    133.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
2DAGS
32.9MWL
133.5MGOCOCKROACHES IN MANHOLE
131.1DAGS
133.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
32.9MWM
2.8SAP
0MWL
0MGOCOCKROACHES IN MANHOLE
102.7TFC
0MWM
98.9TFA
133.5AMHH 0900
131.1SAP
99.4TBA
0AMHH 0901

Properties (7)

additional_info
630069092721204
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-09-28T01:48:50-07:00
documentation
PRO PIPE
is_lateral_inspection
false