Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 10, 2021, 04:40 PM
  • 01 0003A_01 0003_12102021_103041.mp4

Date
12/10/2021
W/O
0926256
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
PipeID
010003-010003a
Time
8:40 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H2045
Sewer Name
BULLIS ROAD LOCAL LINE
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Maintenance Related
Project
20211210MI_BULLIS_ROAD_LOCAL_LINE
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
01 0003
Downstream MH
01 0003A
Dir. of Survey
Upstream
Length Surveyed
311 ft.
Total Length
311 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 01 0003 to 01 0003A
MH: 01 0003MH: 01 0003Aupstream0 ft. AMH - Upstream Manhole, Survey Ends - 11:05 AM - MH 0003A IS BURIED15.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN23.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN56.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN80.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN192.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN237.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN282.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN303 ft. MGO - General Observation - PIPE MATERIAL IS VCP311 ft. AMH - Downstream Manhole, Survey Begins - 10:30 AM311 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (8)

  • General Observation - PIPE MATERIAL IS VCP

    8 ft. - General Observation - PIPE MATERIAL IS VCP

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

    28.7 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

    118.9 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

    230.4 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

    254.3 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

    287.3 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

    295.9 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN

  • Upstream Manhole, Survey Ends - 11:05 AM - MH 0003A IS BURIED

    311 ft. - Upstream Manhole, Survey Ends - 11:05 AM - MH 0003A IS BURIED

Observations (11)

DistanceCodeObservation
230.4TFOPEN
0AMH10:30 AM
73.4TFOPEN
8MGOPIPE MATERIAL IS VCP
287.3TFOPEN
295.9TFOPEN
311AMH11:05 AM - MH 0003A IS BURIED
28.7TFOPEN
118.9TFOPEN
0MWL
254.3TFOPEN

Properties (7)

additional_info
TO CONFIRM PIPE MATERIAL AND LOCATIONS OF HOUSE CONNECTIONS
custom_field_three
TO CONFIRM PIPE MATERIAL/LOCATION OF CONNECTIONS
custom_field_two
5
customer
LACSD
datetime
2021-12-10T08:40:43-08:00
documentation
IGNACIO, SHADLER, RAMIREZ
is_lateral_inspection
false