01 0004_01 0003A_12102021_135853.mp4
7 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 4", 4" - OPEN
45.7 ft. - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4" - OPEN
84.6 ft. - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4" - OPEN
123.6 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN
169 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
211.3 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
250.1 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
292.7 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"
314.1 ft. - Downstream Manhole, Survey Ends - MH 0003A-BURIED
| Distance | Code | Observation |
|---|---|---|
| 250.1 | TFA | — |
| 169 | TFA | — |
| 314.1 | AMH | MH 0003A-BURIED |
| 292.7 | TF | — |
| 45.7 | TF | OPEN |
| 2 | MGO | PIPE MATERIAL IS VCP |
| 7 | TFD | OPEN |
| 0 | AMH | 08:50 AM |
| 123.6 | TF | OPEN |
| 211.3 | TFA | — |
| 0 | MWL | DRY LINE |
| 84.6 | TF | OPEN |