Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 12, 2021, 05:23 AM
  • 16 0571_16 0570_10112021_223613.mp4

Date
10/11/2021
W/O
916508
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00659
PipeID
P13622
Time
10:23 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9438
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_916508_TV16077_OCT2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
16 0571
Downstream MH
16 0570
Dir. of Survey
Downstream
Length Surveyed
253.7 ft.
Total Length
253.7 ft.
Structural Index
4
Structural Quick
5F3I
Structural Rating
335
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
337
Pipe schematic from manhole 16 0571 to 16 0570
MH: 16 0571MH: 16 0570downstream0 ft. AMH - Upstream Manhole, Survey Begins - 16 05710 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"32.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"61 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"70.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start88.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"93 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"108.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.5 ft. RFB - Roots Fine Barrell, from 10 to 02 o'clock128.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"160.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"181.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"216.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253 ft. MGO - General Observation - Surface Spalling throughout, from 9 to 3 oclock253.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish253.7 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK253.7 ft. AMH - Downstream Manhole, Survey Ends - 16 0570253.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    70.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
0AMH16 0571
2.4SAP
32.3TF
160.8TFC
128.5TFC
70.5SRV
253.7SRV
88.6TFC
253.7MGOCONNECTION AT THE MH 9 OC'LOCK
93TF
8.4TFC
181.4TFC
61TFC
125.5RFB
253MGOSurface Spalling throughout, from 9 to 3 oclock
253.7AMH16 0570
0MWM
253.7SAP
216.3TFC
108.7TFC
0MWL

Properties (7)

additional_info
630074101121201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-10-11T22:23:38-07:00
documentation
PROPIPE
is_lateral_inspection
false