- Date
- 12/08/2021
- W/O
- 0926975
- Weather
- Dry
- Operator/Surveyor
- IGNACIO
- Sewer ID
- Z00431
- PipeID
- P05403
- Time
- 9:07 AM
- Certificate
- U-115-06022628
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H2042
- Sewer Name
- 05 DISTRICT #5 MAIN TRUNK
- City
- HAWTHORNE
- Loc. details
- Easement/Right of Way
- Location Code
- D
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 13
- Purpose
- Capital Improvement Program Assesment
- Project
- 20211208MI_DISTRICT_5_MAIN_TRUNK
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 39 in.
- Upstream MH
- 05 0113
- Downstream MH
- 05 0112
- Dir. of Survey
- Downstream
- Length Surveyed
- 324 ft.
- Total Length
- 324 ft.
- Structural Index
- 3
- Structural Quick
- 3121
- Structural Rating
- 5
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 5
Pipe schematic from manhole 05 0113 to 05 0112 Observation photos (3)

8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

205.4 ft. - General Photograph - SPALLING

324 ft. - Downstream Manhole, Survey Ends - 10:45 AM