Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 15, 2021, 09:34 AM
  • H 0097_H 0096_10152021_014057.mp4

Date
10/15/2021
W/O
916413
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00165
PipeID
P10549
Time
2:34 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9446
Sewer Name
H JOINT OUTFALL H - UNIT 1F
City
HUNTINGTON PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_916413_TV01220_OCT2021
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
H 0096
Downstream MH
H 0097
Dir. of Survey
Upstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole H 0096 to H 0097
MH: H 0096MH: H 0097upstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: NO0 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO2.1 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. MWL - Water Level, 20 %of cross sectional area2.1 ft. AMH - Downstream Manhole, Survey Begins - H 0096

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: NO

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: NO

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

    2.1 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

Observations (7)

DistanceCodeObservation
0MWM
0MWL
2.1DAGS
0AMHH 0096
2.1MSAVIEW OF UPLEG OF D/S SIPHON
2.1SAP
2.1SSS

Properties (7)

additional_info
630074101421201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-10-15T02:34:54-07:00
documentation
PROPIPE
is_lateral_inspection
false