Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 22, 2021, 06:55 AM
  • _29 0120_10222021_001458.mp4

Date
10/21/2021
W/O
916310
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00273
PipeID
P23911
Time
11:55 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9508
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_916310_TV29103_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0120
Dir. of Survey
Upstream
Length Surveyed
237.9 ft.
Total Length
237.9 ft.
Structural Index
2
Structural Quick
2H00
Structural Rating
94
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
190
Pipe schematic from manhole 29 0120 to unknown
MH: 29 0120MH: upstream0 ft. AEP - End of Pipe2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"5.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN29.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN43.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN53.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.4 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - BROKEN CONN/OPEN106.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN109.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN154.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN182.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN206.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"209.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"235.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start235.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start237.9 ft. MWM - Water Mark, 10 %of cross sectional area237.9 ft. AMH - Downstream Manhole, Survey Begins - 29 0120237.9 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (1)

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    194.3 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (21)

DistanceCodeObservation
28.8TFC
194.3TBOPEN
2SSS
83.7TFOPEN
235SSS
208.4TFOPEN
0MWM
128.3TFOPEN
184.7TFC
237.9AEP
2DAGS
55.2TFOPEN
0AMH29 0120
131.1TFOPEN
31.6TFC
0MWL
133.5TFDBROKEN CONN/OPEN
182TFC
235DAGS
234.9TFC
232.1TFOPEN

Properties (7)

additional_info
630074102121201
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-10-21T23:55:50-07:00
documentation
PROPIPE
is_lateral_inspection
false