Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 22, 2021, 07:27 AM
  • _29 0119_10222021_004545.mp4

Date
10/22/2021
W/O
916310
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00273
PipeID
P23909
Time
12:27 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9508
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_916310_TV29103_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0119
Dir. of Survey
Upstream
Length Surveyed
236.3 ft.
Total Length
236.3 ft.
Structural Index
2
Structural Quick
2H00
Structural Rating
92
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
92
Pipe schematic from manhole 29 0119 to unknown
MH: 29 0119MH: upstream0 ft. AEP - End of Pipe2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"5.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN81.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN102.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN156 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN175.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN180.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"207.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"234.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start236.3 ft. MWL - Water Level, 5 %of cross sectional area236.3 ft. AMH - Downstream Manhole, Survey Begins - 29 0119236.3 ft. MGO - General Observation - ROACHES @ MH236.3 ft. MWM - Water Mark, 10 %of cross sectional area

Observation photos (1)

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    61.1 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (19)

DistanceCodeObservation
236.3AEP
234SSS
0MWL
28.7TFC
133.8TFC
182TFOPEN
61.1TBOPEN
55.6TFC
80.3TFOPEN
2SSS
0AMH29 0119
107.2TFOPEN
230.5TFC
0MGOROACHES @ MH
4.6TFC
155TFOPEN
131.2TFC
233.2TFC
0MWM

Properties (7)

additional_info
630074102121201
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-10-22T00:27:54-07:00
documentation
PROPIPE
is_lateral_inspection
false