Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 22, 2021, 08:10 AM
  • 29 0092_29 0079_10222021_012339.mp4

Date
10/22/2021
W/O
916310
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00273
PipeID
P23873
Time
1:10 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9508
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_916310_TV29103_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
29 0079
Downstream MH
29 0092
Dir. of Survey
Upstream
Length Surveyed
249.6 ft.
Total Length
249.6 ft.
Structural Index
2
Structural Quick
2I00
Structural Rating
98
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
198
Pipe schematic from manhole 29 0079 to 29 0092
MH: 29 0079MH: 29 0092upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 00922.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish13 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN27.6 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - BROKEN CONN/OPEN57.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN98.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN101 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN154.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN174.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN177.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"193 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN247.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start247.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start249.6 ft. MGO - General Observation - ROACHES @ MH249.6 ft. AMH - Downstream Manhole, Survey Begins - 29 0079249.6 ft. MWM - Water Mark, 25 %of cross sectional area249.6 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (2)

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    56.6 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    74.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (19)

DistanceCodeObservation
0MGOROACHES @ MH
71.7TFC
0AMH29 0079
2DAGS
74.9TBOPEN
151.4TFOPEN
2SSS
247DAGS
222TFDBROKEN CONN/OPEN
56.6TBOPEN
0MWM
148.6TFOPEN
236.6TFOPEN
0MWL
95.4TFOPEN
249.6AMH29 0092
192.3TFC
247SSS
180.8TFOPEN

Properties (7)

additional_info
630074102121201
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-10-22T01:10:43-07:00
documentation
PROPIPE
is_lateral_inspection
false