Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2021, 04:45 AM
  • 03 0301_03 0299_11012021_210506.mp4

Date
11/01/2021
W/O
916298
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00359
PipeID
P05153
Time
9:45 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9518
Sewer Name
03 ANAHEIM STREET TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_916298_TV03133_OCT2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
39 in.
Width
15 in.
Upstream MH
03 0301
Downstream MH
03 0299
Dir. of Survey
Downstream
Length Surveyed
504.7 ft.
Total Length
504.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 03 0301 to 03 0299
MH: 03 0301MH: 03 0299downstream0 ft. AMH - Upstream Manhole, Survey Begins - 03 03010 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT THE MH 3 O'CLOCK0 ft. MGO - General Observation - DROP CONNECTION @ THE MH - 12 O'CLK.56.9 ft. CL - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES503.8 ft. MGO - General Observation - ACTIVE CONNECTION AT THE MH 3 OC'LOCK504.7 ft. AMH - Downstream Manhole, Survey Ends - 03 0299

Observation photos (1)

  • Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    56.9 ft. - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

Observations (8)

DistanceCodeObservation
0AMH03 0301
56.9CL
0MWM
0MWL
0MGOACTIVE CONNECTION AT THE MH 3 O'CLOCK
504.7AMH03 0299
503.8MGOACTIVE CONNECTION AT THE MH 3 OC'LOCK
0MGODROP CONNECTION @ THE MH - 12 O'CLK.

Properties (7)

additional_info
630074110121202
custom_field_three
RFIR NO SEVERE DEFECTS
custom_field_two
3
customer
1
datetime
2021-11-01T21:45:33-07:00
documentation
PROPIPE
is_lateral_inspection
false