02 1898_02 1897_11232021_122232.mp4
3.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
3.9 ft. - Water Level, Sag in pipe, 60 %of cross sectional area, Start
14.2 ft. - Water Level, Sag in pipe, 100 %of cross sectional area, Finish
52.1 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 04 to 06 o'clock, , within 8 inches of joint: YES
68.5 ft. - Surface Roughness Increased Mechanical, from 07 to 05 o'clock, within 8 inches of joint: YES - CHIPPING/SPALLING
103.8 ft. - Intruding Sealing Ring Hanging, 5 %of cross sectional area, from 02 to 05 o'clock
106.2 ft. - Water Level, Sag in pipe, 65 %of cross sectional area, Start
| Distance | Code | Observation |
|---|---|---|
| 23.7 | MWLS | — |
| 14.2 | MWLS | — |
| 9.8 | MCU | — |
| 3.8 | FM | — |
| 23.7 | B | — |
| 103.8 | ISSRH | — |
| 106.2 | MWLS | — |
| 68.5 | SRIM | CHIPPING/SPALLING |
| 3.9 | B | — |
| 109.5 | MSA | DUE TO SAG |
| 93.7 | MWL | — |
| 0 | MGO | CONNECTION AT MH, 9 OCLOCK, ACTIVE |
| 52.1 | DAR | — |
| 109.5 | MWLS | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 3.9 | MWLS | — |
| 0 | AMH | 12:45 PM |