Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2021, 07:14 AM
  • H 0193_H 0192_10142021_002614.mp4

Date
10/14/2021
W/O
916726
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00169
PipeID
P11217
Time
12:14 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9445
Sewer Name
H JOINT OUTFALL H - UNIT 2C
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
WO_916726_TV02168_OCT2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0193
Downstream MH
H 0192
Dir. of Survey
Downstream
Length Surveyed
233.1 ft.
Total Length
233.1 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
225
Pipe schematic from manhole H 0193 to H 0192
MH: H 0193MH: H 0192downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 01936.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start233.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish233.1 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK233.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish233.1 ft. AMH - Downstream Manhole, Survey Ends - H 0192

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 3 OC'LOCK
6.8SAP
6.8SSS
233.1SSS
0MWM
233.1MGOCONNECTION AT THE MH 3 OC'LOCK
233.1SAP
0MWL
0AMHH 0193
233.1AMHH 0192

Properties (7)

additional_info
630074101321202
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-10-14T00:14:58-07:00
documentation
PROPIPE
is_lateral_inspection
false