Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2021, 09:38 AM
  • H 0189_H 0188_10142021_024927.mp4

Date
10/14/2021
W/O
916726
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00169
PipeID
P11213
Time
2:38 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9445
Sewer Name
H JOINT OUTFALL H - UNIT 2C
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
WO_916726_TV02168_OCT2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0189
Downstream MH
H 0188
Dir. of Survey
Downstream
Length Surveyed
226.9 ft.
Total Length
226.9 ft.
Structural Index
3
Structural Quick
5C3H
Structural Rating
320
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
320
Pipe schematic from manhole H 0189 to H 0188
MH: H 0189MH: H 0188downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 01880 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area4.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start127.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start226.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish226.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK226.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish226.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish226.9 ft. AMH - Downstream Manhole, Survey Ends - H 0188226.9 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    127.7 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0AMHH 0188
0MGOCONNECTION AT THE MH 9 OC'LOCK
4.5SAP
226.9SAP
4.5SSS
0MGOCONNECTION AT THE MH 3 OC'LOCK
226.9MGOCONNECTION AT THE MH 9 OC'LOCK
226.9SRV
0MWM
226.9SSS
226.9AMHH 0188
0MWL
127.7SRV
226.9MGOCONNECTION AT THE MH 3 OC'LOCK

Properties (7)

additional_info
630074101321202
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-10-14T02:38:42-07:00
documentation
PROPIPE
is_lateral_inspection
false